Inspiring case studies, thought-provoking forums, and original research make up EC10's technical sessions. Learn proven techniques to help you stay ahead in a competitive market.
These sessions are included with the purchase of any basic conference pass. Once you have purchased a pass, you can attend any of the sessions offered that day. There is no need to register for individual sessions, allowing you the greatest amount of scheduling flexibility.
Our technical program boasts more than 40 distinct sessions over the annual conference. The sessions are presented in a variety of formats such as:
| Date |
Time |
Title |
Primary Presenter or Moderator |
Type |
Section |
|
- |
Sustainability, Erosion Control and LEED: How building products can make or break your project |
Tiffany Ward |
Workshop |
Other |
|
- |
Your Brand as a powerful business asset that creates differentiation & increases profits, customer loyalty & company valuation |
Judith Guido |
Half-Day Training Course |
Other |
|
- |
Total pollution management best practices in Minnesota |
Dwayne Stenlund |
Workshop |
Other |
|
- |
Liability to viability: good environmental practice as a pathway to increased profits for construction companies |
Clare Feeney |
Paper |
Other |
|
- |
The Updated Revised Universal Soil Loss Equation (RUSLE 2) for Construction Sites (Two Day Course) |
Terrence Toy |
Full-Day Training Course |
TS-1 |
|
- |
Using geo-grid re-enforced soil walls to rebuild slides on Pacific Northwest forest roads |
John Evans |
Workshop |
TS-1 |
|
- |
Case Studies in Shallow Landslide Repair and Severe Erosion Mitigation in Sensitive Coastal and Riparian Areas |
Colby Barrett |
Case |
TS-1 |
|
- |
Results of Field Tests of Ground Covers on Construction Sites |
Richard McLaughlin |
Paper |
TS-1 |
|
- |
Bioingenieria de Suelos en la recuperacion de areas degradadas y estabilizacion de taludes y laderas. |
Luiz Lucena |
Half-Day Training Course |
TS-1 |
|
- |
The EC3 Project: Linking Stream Restoration, Stormwater Improvements, and Bank Stabilization for a section of the Ottawa River, University of Toledo, Ohio |
Patrick Lawrence |
Poster |
TS-2 |
|
- |
Engineered Log Jams for River Bank Stabilization and Salmonid Habitat Enhancement in the Pacific Northwest |
Matt Koozer |
Poster |
TS-2 |
|
- |
Vegetated Riprap Installation Techniques for Watercourse Erosion Protection, Fish and Wildlife Habitat Creation |
Pierre Raymond |
Case |
TS-2 |
|
- |
Soil Bioengineering for Control of Soil Erosion in a Re-Constructed Waterway on an Alberta Oil Sands Overburden Dump |
Pierre Raymond |
Case |
TS-2 |
|
- |
Erosion and Sediment Control Design for Stream Restoration Projects |
Jan Patterson |
Full-Day Training Course |
TS-2 |
|
- |
Eco-friendly river bank protection technologies using coir geotextiles |
ANIL KUNNATH RAJAN |
Poster |
TS-2 |
|
- |
Linking Goals and Priorities to Sustainable River Restoration Design: Herrick Hollow Creek, New York |
Siva Sangameswaran |
Case |
TS-2 |
|
- |
Zona Rosa Mixed-Used Development & Rush Creek Restoration |
Jason Dremsa |
Poster |
TS-2 |
|
- |
Sustainable Native Plant Establishment for Erosion and Sediment Control |
Adrain Juncosa |
Full-Day Training Course |
TS-3 |
|
- |
Prospects and problems of use of coir geo-textiles for soil conservation work in forest area |
U.S. Sarma |
Paper |
TS-3 |
|
- |
Land reclamation on Easter Island |
Pablo Garcia-Chevesich |
Case |
TS-3 |
|
- |
Continuing Land Degradation and Its Cause-Effect in Ethiopia's Central Rift Valley |
Derege Meshesha |
Paper |
TS-3 |
|
- |
Vegetation Establishment on Slopes: A Primer |
Elizabeth Guertal |
Half-Day Training Course |
TS-3 |
|
- |
Integrated Water & Soil Management for Erosion Control |
Krunal Negandhi |
Case |
TS-3 |
|
- |
The Benefits of Biotics in Erosion Control Materials for Critical Sites: Better Business, Improved Soil, and Stronger Vegetation |
Mark Myrowich |
Case |
TS-3 |
|
- |
How to Specify and Establish Sustainable Vegetation |
Brian Free |
Workshop |
TS-3 |
|
- |
Establishing and Maintaining Common Bermudagrass on Steep Slopes in Alabama |
Mark Dougherty |
Paper |
TS-3 |
|
- |
Successful LID Practices to Control Erosion and Develop a Sustainable Project |
Brent Hallock |
Full-Day Training Course |
TS-3 |
|
- |
Effect of Comprehensive Stormwater Management Planning (CSWMP) & Green Technology Best Management Practices (GTBMPs) on the Augustine Creek Subdivision, New Castle County Department of Special Services (NCCDSS) Regulatory Compliance, and User Goals. |
Todd Fritchman |
Workshop |
TS-4 |
|
- |
Low Impact Development for Clean Water: Proper Design, Installation, and Maintenance - Updated for 2011! |
Jay Riggs |
Full-Day Training Course |
TS-4 |
|
- |
Sediment Control Systems |
Albert Jarrett |
Full-Day Training Course |
TS-4 |
|
- |
Understanding the Ramifications of EPA’s Effluent Limitation Guidelines |
Jason Ziemer |
Full-Day Training Course |
TS-4 |
|
- |
Achieving Numeric Turbidity Limits on Dewatering Projects |
Jason Ziemer |
Paper |
TS-4 |
|
- |
Successfully Implementing Active and Passive Treatment Systems |
Jason Ziemer |
Workshop |
TS-4 |
|
- |
Turbidity Sampling: Developing and Implementing a Protocol for Sampling on TDOT Projects |
Beth Chesson |
Paper |
TS-4 |
|
- |
Watershed Protection and Restoration: A How to Guide for TMDLs |
Jay Riggs |
Full-Day Training Course |
TS-4 |
|
- |
Rain Gardens in the High School Setting |
Shelby Jett |
Case |
TS-4 |
|
- |
Streamlining Stormwater Pollution Prevention Plans (SWPPPs) for Linear Utility Projects |
Jennifer Keyes |
Paper |
TS-4 |
|
- |
Learning the Language of Polymers: How They Work, Identifying the Correct Type, and Applications in the Field |
Seva Iwinski |
Half-Day Training Course |
TS-4 |
|
- |
Houston Case Study: Driving Adoption and Implementation of LID |
Robert Adair |
Case |
TS-4 |
|
- |
The Green ROW Technology for Construction of Longitudinal Works |
Angel Menendez |
Paper |
TS-6 |
|
- |
An Introduction to Erosion Processes |
Pablo Garcia-Chevesich |
Half-Day Training Course |
TS-6 |
|
- |
Advanced Inspection |
Alex Zimmerman |
Full-Day Training Course |
TS-6 |
|
- |
Construction Site sampling and turbidity reduction |
Alex Zimmerman |
Full-Day Training Course |
TS-6 |
|
- |
Principles of Turbidity Control on Construction Sites |
Richard McLaughlin |
Full-Day Training Course |
TS-6 |
|
- |
New Scour Protection Technology – How Does it Stack Up? |
Amanda Cox |
Paper |
TS-6 |
|
- |
Minimizing Exposure to Numeric Effluent Limits |
Brian Noll |
Workshop |
TS-6 |
|
- |
Reservoir Sedimentation and its management options: the case of Angereb dam-catchment, Northern Ethiopia |
Nigussie Haregeweyn |
Paper |
TS-6 |
|
- |
The Five Pillars of Construction Storrmwater |
Barry Fagan |
Workshop |
TS-6 |
|
- |
Intra- & Inter-Storm Variability in Effluent Turbidity from Passive Treatment Systems (PTS) from Construction & Development Projects |
Kevin Wolfe |
Case |
TS-6 |
|
- |
Headponds - Heros or Enemies? |
Elyse MacDonald |
Case |
TS-6 |
|
- |
A Risk-Sharing Approach to Specifying Erosion and Sediment Control Facilities for Construction Sites |
David Todd |
Workshop |
TS-6 |
|
- |
Effects Of Selected Soil Conditioners On Soil Erosion, Runoff, And Vegetation Growth |
Amir Hass |
Paper |
TS-6 |
|
- |
Staged Stabilization of Linear Projects, Minimizing Your Exposure to NELs |
Ted Sherrod |
Paper |
TS-6 |
|
- |
Water Quality and Plant Establishment Relative to Four Hydromulches Under Simulated Rainfall |
Brent Hallock |
Paper |
TS-6 |
|
- |
Elements of Construction Site Storm Water Management |
Brock Peters |
Half-Day Training Course |
TS-6 |
|
- |
The Influence of Turbidity Samples with Varying Particulate Characteristics on Different Measurement Technologies |
Michael Sadar |
Paper |
TS-6 |
|
- |
Developing a Local Training Program for Soil Erosion and Sediment Control |
Jay Wilson |
Workshop |
TS-6 |
|
- |
Performance Evaluation of two silt fence fabrics and polyacrylamide enhanced silt fence applications on construction sites |
Manoj Chopra |
Paper |
TS-6 |
|
- |
Will Conventional BMPs Meet Numeric Effluent Limits? A Decision Support Tool for BMP Selection |
Brian Currier |
Paper |
TS-6 |
|
- |
Gully Analysis and Control |
William Hansen |
Half-Day Training Course |
TS-6 |
|
- |
Standardized Evaluation of Bioengineering Shoreline Stabilization |
John Chapman |
Paper |
TS-7 |
|
- |
Wind Erosion Control - Theory into Practice |
David Walker |
Full-Day Training Course |
TS-8 |
|
- |
Lake Tahoe California Residential Lake Shoreline Stabilization and Restoration |
James Chinchiolo |
Case |
TS-7 |
|
- |
Field-based monitoring and assessment for water quality in the built environment |
Rebecca Kauten |
Half-Day Training Course |
TS-4 |
|
- |
Southlake Park Bioretention Cell |
Jason Dremsa |
Poster |
TS-4 |
|
- |
Innovative Designs for Erosion, Sediment, and Turbidity Control |
Ted Sherrod |
Full-Day Training Course |
TS-6 |
|
- |
Turbidity Sampling and Analysis of Storm Water Discharge From Construction Sites |
James Spotts |
Paper |
TS-6 |
|
- |
How to Write Revegetation and Erosion Control Specifications |
Julie Etra |
Half-Day Training Course |
TS-6 |
|
- |
Designer and Reviewer Series – Part II: Technical Assessment of Construction Site BMPs |
Jerald Fifield |
Full-Day Training Course |
TS-6 |
|
- |
Specifying Erosion and Sediment Control Practices |
David Todd |
Half-Day Training Course |
TS-6 |
|
- |
Advanced Treatment Systems for the Phase II world |
Tyrone Clager |
Workshop |
TS-6 |
|
- |
A Passive Approach to Treating Turbidity on Construction Sites |
Melanie McCaleb |
Paper |
TS-6 |
|
- |
Geosynthetic Stabilized Earth using Compost Filter Socks for Sustainable Vegetated Walls and Slopes |
Stanley Miller |
Paper |
TS-1 |
|
- |
CISEC Training Modules and Examination |
Jerry Fifield |
Full-Day Training Course |
TS-4 |
|
- |
3rd Party Lawsuits. Coming soon to a job site near you! |
Jim Berger |
Workshop |
TS-6 |
|
- |
Designer and Reviewer Series – Part I Developing Effective Sediment and Erosion Control Drawings for Contractors |
Jerald Fifield |
Full-Day Training Course |
TS-6 |
|
- |
Use of Soil Loss Management to Regulate and Protect Air and Water Quality |
Heather Sinton |
Case |
TS-6 |
|
- |
POST CONSTRUCTION: What’s That? |
Janet Paith |
Paper |
TS-4 |
|
- |
Site Inspection Techniques that really work! |
Jennifer Hildebrand |
Half-Day Training Course |
TS-4 |
|
- |
A Thousand LIttle Treatment Plants: A Processed Base Design Approach to Structural BMPs |
David Todd |
Workshop |
TS-6 |
|
- |
Erosion Prevention and Sediment Control Program (EPSC) Auditing for Linear Highway Projects; Are We Making Progress? |
J.P. Johns |
Paper |
TS-6 |
|
- |
Design of Infiltration Stormwater Facilities by Limit Equilibrium Analysis of Hydraulic Conductivity and Geometry. |
Keithe Merl |
Paper |
TS-4 |
|
- |
“Speaking each other’s language”: Using education to bring together industry and enforcement |
Jennifer Hildebrand |
Workshop |
TS-4 |
|
- |
“How to write a SWPPP to meet NPDES Compliance”. |
Jennifer Hildebrand |
Full-Day Training Course |
TS-4 |
|
- |
Evaluating an integrated catchment management in land rehabilitation in the Northern Ethiopia: the case of Enabered catchment |
Nigussie Haregeweyn |
Paper |
TS-6 |
|
- |
Grant Proposal Writing for the Rest of Us: Demystifying the Process |
Rodney Verhoeff |
Half-Day Training Course |
Other |
|
- |
Beach Erosion: This Sand's for You |
Virginia Barker |
Paper |
TS-7 |
| Wednesday, February 17 |
| 2/17/2010 |
8:30 AM - 12:00 PM |
How to Update and Maintain the SWPPP |
Shirley Morrow |
Half-Day Session |
TS-4 |
| 2/17/2010 |
8:30 AM - 12:00 PM |
Elements of Construction Site Stormwater Management |
Brock Peters |
Half-Day Session |
TS-6 |
| 2/17/2010 |
8:30 AM - 10:00 AM |
Innovative Check Dams that Aid in Meeting ELGs |
Ted Sherrod |
Case |
TS-6 |
| 2/17/2010 |
8:30 AM - 10:00 AM |
Maximizing CESSWI™ or CPSWQ® certification within the land development industry |
Tony Wernke |
Forum |
Other |
| 2/17/2010 |
8:30 AM - 12:00 PM |
Visioneering: How to Turn Great Ideas Into Business Results |
Alan McNiel |
Half-Day Session |
Other |
| 2/17/2010 |
8:30 AM - 10:00 AM |
Design Alternatives for Urban Stream Restoration |
J.P. Johns |
Case |
TS-2 |
| 2/17/2010 |
8:30 AM - 10:00 AM |
Long-term sustainable site management strategies at Fresh Pond Reservation, Cambridge, MA |
Jason Lederer |
Case |
TS-4 |
| 2/17/2010 |
8:30 AM - 10:00 AM |
Controlling Erosion on a Hard Rock Quarry Reclamation Project |
Jill Pack, CPESC |
Case |
TS-1 |
| 2/17/2010 |
8:30 AM - 12:00 PM |
Developing a beach landscape design that addresses sand erosion control, creation of habitat, and accommodation of a variety of visitor uses |
Pete Melby |
Half-Day Session |
TS-1 |
| 2/17/2010 |
8:30 AM - 10:00 AM |
Innovative Techniques in the Gabion System |
George Ragazzo |
Workshop |
TS-6 |
| 2/17/2010 |
10:30 AM - 12:00 PM |
Restoration of eroded banks using bioengineering |
Jack Greening Jr |
Case |
TS-7 |
| 2/17/2010 |
10:30 AM - 12:00 PM |
Prevention of soil erosion through vegetation of mine dumps using coir geotextiles |
U.S. Sarma |
Case |
TS-8 |
| 2/17/2010 |
10:30 AM - 12:00 PM |
Morphological and Economical Analysis of Plunge Pools |
Chris Estes |
Paper |
TS-4 |
| 2/17/2010 |
10:30 AM - 12:00 PM |
Evaluation of four revegetation treatments using a hydroseeding technique at the Yanacocha mine |
Kelvin Reyes, M. Sc |
Case |
TS-3 |
| 2/17/2010 |
10:30 AM - 12:00 PM |
A Team Approach to Designing a Phasing and Sequencing Plan That Works |
Randall Shuey, CSS, CPESC |
Workshop |
TS-6 |
| 2/17/2010 |
1:00 PM - 2:30 PM |
Business 2.0: Harnessing the power of the Internet |
Patrick Robbins |
Paper |
Other |
| 2/17/2010 |
1:00 PM - 5:00 PM |
Vegetation Establishment on Slopes - A Primer |
Elizabeth Guertal |
Half-Day Session |
TS-3 |
| 2/17/2010 |
1:00 PM - 5:00 PM |
Effective Education Techniques for MS4 Compliance and Measurable Water Quality Improvements |
Angie Hong |
Half-Day Session |
TS-4 |
| 2/17/2010 |
1:00 PM - 5:00 PM |
Concrete Management Best Practices in Minnesota |
Dwayne Stenlund, MS, CPESC, CPRM |
Half-Day Session |
Other |
| 2/17/2010 |
1:00 PM - 2:30 PM |
Restoring the San Antonio River: What is Happening Outside of the Riverwalk |
Jacque Thomas, PE |
Case |
TS-2 |
| 2/17/2010 |
1:00 PM - 2:30 PM |
Small Channel Slope Stabilization Using Turf Mat and Vegetation |
Howard Redfearn |
Case |
TS-6 |
| 2/17/2010 |
1:00 PM - 2:30 PM |
Gilboa Dam Reconstruction Site Case Study: Using a Variety of Inventive Erosion, Sediment, and Stormwater Controls to Protect Natural Resources |
Jennifer Cass |
Case |
TS-6 |
| 2/17/2010 |
1:00 PM - 2:30 PM |
Remediation and Stabilization of Slopes Exhibiting Acidic Water Runoff |
Helen Cummiskey |
Poster |
TS-1 |
| 2/17/2010 |
1:00 PM - 2:30 PM |
Ravine Stabilization, Grade, Bank, and Slope Stabilization on Small Streams in Northeast Illinois |
Jonathan Koepke, CEPSC, LEED-AP |
Workshop |
TS-2 |
| 2/17/2010 |
1:00 PM - 5:00 PM |
Digital Data Collection for NPDES Compliance |
Jay Riggs |
Half-Day Session |
TS-6 |
| 2/17/2010 |
1:00 PM - 2:30 PM |
Debris Flow Hazards in Iran |
Mohammadreza Parsamehr |
Poster |
TS-6 |
| 2/17/2010 |
3:00 PM - 4:30 PM |
CONTAINMENT OF NPDES COMPLIANCE COSTS IN THE HOME BUILDING VERTICAL CONSTRUCTION MARKET |
Frank Jackson |
Case |
TS-6 |
| 2/17/2010 |
3:00 PM - 4:30 PM |
Large Scale Testing Results of Widely Used Erosion Control Practices |
Britt Faucette, Ph.D., CPESC, LEED AP |
Paper |
TS-6 |
| 2/17/2010 |
3:00 PM - 4:30 PM |
Techniques for Establishing Vegetation for Long-term Erosion Control on Disturbed Slopes in Alabama |
Mark Dougherty |
Paper |
TS-3 |
| 2/17/2010 |
3:00 PM - 4:30 PM |
Using HEC-GeoRAS as a Design Tool for the San Antonio River Mission Reach Restoration Project |
Tim Whitefield, P.E., CFM |
Paper |
TS-2 |
| 2/17/2010 |
3:00 PM - 4:30 PM |
The Evolution of Erosion Control Technology |
Peter Hanrahan |
Workshop |
TS-6 |
| Thursday, February 18 |
| 2/18/2010 |
8:30 AM - 10:00 AM |
River Restoration in the UK - London Rivers Action Plan |
Andrew Brookes, BSc, PhD, FCIWEM, MIEMA, FRGS, CEnv, CSci, CGeog |
Case |
TS-2 |
| 2/18/2010 |
8:30 AM - 10:00 AM |
The Economic Benefits of completing Reclamation Properly the First Time on Oil & Gas/Natural Gas and Coal Bed Methane Drill Pads |
David Chenoweth |
Case |
TS-3 |
| 2/18/2010 |
8:30 AM - 10:00 AM |
Behind Bars and Breaking the Bank |
Rebecca Scott |
Paper |
TS-4 |
| 2/18/2010 |
8:30 AM - 10:00 AM |
Advanced Treatment Systems: An Overview of Design, Operations, Effectiveness, and Costs |
Joseph Gannon |
Workshop |
TS-6 |
| 2/18/2010 |
8:30 AM - 10:00 AM |
Storm Water Infiltration in Clay Soils |
Chris Estes |
Case |
TS-4 |
| 2/18/2010 |
8:30 AM - 10:00 AM |
Performance Testing of the Aggregate Filled Geoweb Confinement System |
Jon Renholds |
Paper |
TS-6 |
| 2/18/2010 |
8:30 AM - 12:00 PM |
Exploring a Purposeful Phase II MS4 March to Compliance |
Jesse W. Poore |
Half-Day Session |
TS-4 |
| 2/18/2010 |
8:30 AM - 10:00 AM |
How to get published; Working with the trade press |
Dan Waldman |
Forum |
Other |
| 2/18/2010 |
10:30 AM - 12:00 PM |
EPA Starts Process Towards Changes in the Stormwater Program |
Diana McDonald |
Forum |
TS-4 |
| 2/18/2010 |
10:30 AM - 12:00 PM |
Complying with a Federal 5% Plan for Particulates - How Emissions Inventory are Calculated and Play a Significant Role in the Formulation of a Strategy for Compliance within a State Implementation Plan |
Cameron Flower |
Paper |
TS-8 |
| 2/18/2010 |
10:30 AM - 12:00 PM |
Shasta College Hydromulch Trials ”Does the application rate of 4000lbs/acre vs. 2000lbs/acre inhibit native grass seed from germination and growth?” |
Tara Petti |
Case |
TS-3 |
| 2/18/2010 |
10:30 AM - 12:00 PM |
How to Write Revegetation and Erosion Control Specifications |
Julie Etra |
Paper |
TS-3 |
| 2/18/2010 |
10:30 AM - 12:00 PM |
Polymer Enhanced Best Management Practices for Erosion and Sedimentation Control, Water Clarification with a focus on nutrient control, and soil stabilization. |
Seva Iwinski |
Paper |
Other |
| 2/18/2010 |
10:30 AM - 12:00 PM |
Large-scale Erosion and Sediment Control Testing Facility at Auburn University |
Wesley Donald |
Paper |
TS-6 |
| 2/18/2010 |
10:30 AM - 12:00 PM |
Developing a Stormwater Auditing Program for Construction Sites |
Jennifer Keyes |
Paper |
TS-4 |
| 2/18/2010 |
1:00 PM - 2:30 PM |
Performance Testing of Sediment Retention Devices |
C. Joel Sprague |
Paper |
TS-6 |
| 2/18/2010 |
1:00 PM - 2:30 PM |
Constructed Riffle Protects Exposed Wastewater Line. Country Club Creek – Austin, Texas. Design – Construction – Monitoring. |
Andrew Johnston |
Paper |
TS-2 |
| 2/18/2010 |
1:00 PM - 5:00 PM |
IECA Member's Role in Sustainable Land Development International's (SLDI's) Project Certification Program |
Tony Wernke |
Half-Day Session |
Other |
| 2/18/2010 |
1:00 PM - 2:30 PM |
AN AUTOMATIC PROCEDURE TO DETERMINE MOBILIZED SOIL VOLUMES FOR A PIPELINE TRACK GRADING |
Angel Menendez, Ph.D |
Paper |
TS-6 |
| 2/18/2010 |
1:00 PM - 2:30 PM |
LEED Certification-Who, What, Where, Why and More |
Don Thieman, CPESC, LEED Green Associate |
Workshop |
Other |
| 2/18/2010 |
1:00 PM - 2:30 PM |
Reforestation of the Mission Reach of the San Antonio River |
Neil Thomas |
Case |
TS-3 |
| 2/18/2010 |
1:00 PM - 5:00 PM |
Bottom Line Sales & Marketing Techniques for any Economy-What your Competition Doesn't want you to know! |
Judith Guido |
Half-Day Session |
Other |
| 2/18/2010 |
3:00 PM - 5:00 PM |
Effluent Guidelines – Insights into Compliance with EPA’s New Turbidity Standards |
Jesse Pritts |
Paper |
TS-1 |
| Friday, February 19 |
| 2/19/2010 |
8:30 AM - 10:00 AM |
Comparative evaluation of carbon sequestered in revegetated slope with bioengineering techniques |
Terezinha Galvao |
Paper |
TS-6 |
| 2/19/2010 |
8:30 AM - 10:00 AM |
IECA’s Reviewer Update |
Jimmy Eanes, CPESC, CESSWI, CMP |
Forum |
Other |
| 2/19/2010 |
8:30 AM - 10:00 AM |
Polymer-Enhanced Soft Armoring: An Erosion and Sediment Control Measure for Construction Fill Slopes |
Wesley Zech |
Paper |
TS-6 |
| 2/19/2010 |
8:30 AM - 10:00 AM |
Can Designers and Reviewers Develop Effective Storm Water Management Plans? |
Jerald Fifield |
Forum |
TS-4 |
| 2/19/2010 |
10:30 AM - 12:00 PM |
Leveraging the Natural Environment As Treatmet for Highway Runoff Within the Lake Tahoe Basin |
Mark Rayback |
Case |
TS-4 |
| 2/19/2010 |
10:30 AM - 12:00 PM |
Conquering erosion control in the Pacific Northwest Wilderness |
Elyse MacDonald |
Case |
TS-6 |
| 2/19/2010 |
10:30 AM - 12:00 PM |
Commercial Construction Sediment Control |
Frank Jackson |
Case |
TS-6 |
| 2/19/2010 |
10:30 AM - 12:00 PM |
Delivering Effective PowerPoint Presentations |
Katie Laurin |
Forum |
Other |
| 2/19/2010 |
1:00 PM - 2:30 PM |
Green Design Engineering: A Fresh Approach For Sustainable Erosion Control |
Michael Robeson, M.S., P.E., CPESC, CPSWQ |
Workshop |
TS-6 |