Maintenance Advances in Permeable Interlocking Concrete Pavement

Kevin Earley, PG

Education Track: Stormwater Management

As the use of permeable interlocking concrete pavement (PICP) expands throughout North America, more attention is being focused on long-term performance and maintenance issues. The advantage PICP systems have over other detention and other infiltration stormwater control measures is the accessibility and ease at which sediment material can be removed and replaced from surface voids. This presentation will provide the latest industry information on means and methods of maintaining and restoring PICP surface infiltration and treatment capabilities.

PDF of Presentation
(Adobe PDF File)

Presented by Kevin Earley, PG

Oldcastle Architectural, Inc.

As the use of permeable interlocking concrete pavement (PICP) expands throughout North America, more attention is being focused on long-term performance and maintenance issues. The advantage PICP systems have over other detention and other infiltration stormwater control measures is the accessibility and ease at which sediment material can be removed and replaced from surface voids. This presentation will provide the latest industry information on means and methods of maintaining and restoring PICP surface infiltration and treatment capabilities.